BAM's value chain, turning client needs into built assets. Upstream: suppliers and workers in the value chain, the supply chain of raw materials, manufacturing and transport. Own operations: the own workforce of employees and subcontractors, and BAM construction sites covering design and engineering, construction operations, renovation, and maintenance and facility management. Downstream: clients, end-users and communities, and the built assets through delivery and handover, use of assets, and end of life and demolitionSource: Koninklijke BAM Groep NV 2025 annual report, p.80. View original →

ESRS 2 – General Disclosures

GOV-1The role of the administrative, management and supervisory bodies
Reported

The role of the administrative, management and supervisory bodies

Reference: pages 94, 96, 146.

BAM incorporates part of ESRS 2 GOV-1 by reference. Board composition and diversity are in the biographies; the Executive Board's oversight of the process to manage material impacts, risks and opportunities is in chapter 4.2 Corporate Governance and the Supervisory Board's in chapter 5.1 (page 94).

"The Executive Committee is ultimately responsible and accountable for sustainability at BAM." Divisional management is accountable for implementing the strategy and for reporting, policies and business initiatives in the division (page 96).

For business conduct, the Ethics and Compliance Committee supports the Executive Committee and the divisions; reported suspicions of misconduct are discussed quarterly with the Executive Committee and every six months with the Supervisory Board. The bodies are described as having expertise in business conduct drawn from human resources, operations, finance and engineering (page 146).

GOV-2Information provided to and sustainability matters addressed by the undertaking's administrative, management and supervisory bodies
Reported

Information provided to and sustainability matters addressed by the undertaking's administrative, management and supervisory bodies

Reference: pages 83, 94, 146.

The 2025 double materiality assessment update "has been reviewed by the Risk and Control committee, Executive Committee and Supervisory Committees (Audit committee and Health, Safety and Sustainability committee)" (page 83). The Executive Committee and Supervisory Board validated the approach and outcomes (page 81).

How the Executive Board and Supervisory Board are informed about sustainability matters is incorporated by reference from chapter 4.2 Corporate Governance and chapter 5.1 Report of the Supervisory Board (page 94). Management of the divisions reports sustainability metrics under the BAM sustainability reporting manual, and the Executive Committee receives quarterly reporting on sustainability metric performance (page 96).

GOV-2(was GOV-3)Integration of sustainability-related performance in incentive schemes
Reported

Integration of sustainability-related performance in incentive schemes

Reference: pages 73-74, 94.

"Sustainability targets on social as well as environmental performance are part of the Executive Board's and Executive Committee's long- and short-term incentive schemes." The key elements of the remuneration policy and the share of variable remuneration tied to sustainability are in chapter 5.2 Remuneration report. Similar short-term incentives, with sustainability targets, apply to the Senior Leadership Group; long-term plans apply to some of that group (page 94).

The 2025 short-term incentive carries three sustainability objectives at 10% weighting each: employee engagement, safety, and Scope 1 and 2 CO2 intensity. The 2023-2025 long-term incentive carries three sustainability objectives at 11.1% each: CDP Climate ranking, Scope 1 and 2 CO2 intensity reduction, and construction and office waste intensity reduction (pages 73-74).

GOV-3(was GOV-4)Statement on due diligence
Reported

Statement on due diligence

Reference: page 94.

BAM's statement on due diligence is a table mapping the core elements of its process to where each is disclosed. The process "is guided by the main aspects and steps of the UN Guiding principles on Business and Human Rights, and the OECD Guidelines" (page 94).

(a) Embedding due diligence in governance, strategy and business model: chapter 6.1 and the governance section of chapter 6.5 (GOV-1). (b) Engaging affected stakeholders: chapter 6.1, Interactions with stakeholders. (c) Identifying and assessing adverse impacts: chapter 6.1 and G1-1 in chapter 6.5. (d) Taking action: S1-1 and S1-4 in chapter 6.4 and G1-1. (e) Tracking effectiveness and communicating: S1-4 and the EU Taxonomy minimum safeguards section of chapter 6.6.

GOV-4(was GOV-5)Risk management and internal controls over sustainability reporting
Reported

Risk management and internal controls over sustainability reporting

Reference: pages 94-95.

"Sustainability and sustainability reporting are embedded in BAM's overall risk management and internal control processes and systems." During 2025 BAM continued to operationalise controls over sustainability reporting "as defined within an integrated Internal Control Framework for material data points, following the 2025 double materiality assessment" (page 94).

The reporting processes and definitions are formalised in BAM's Sustainability Reporting manual, which guides how data is collected, consolidated and reported. How risk assessment and internal control findings feed into functions, and the periodic reporting of findings to the Executive Board and Supervisory Board, are described in chapter 4.1 Risk management (page 95).

SBM-1Strategy, business model and value chain
Reported

Strategy, business model and value chain

Reference: pages 80, 95.

Incorporated by reference to chapter 6.1 Approach to sustainability reporting and chapter 2.4 Strategy 2024-2026: Focus, Transform, Expand (page 95).

BAM describes its value chain as "activities that turn client needs into built assets while minimising environmental and social impacts". Upstream, business development, design and procurement; core construction activities including site preparation, engineering, project management and quality controls; downstream, commissioning, handover and maintenance (page 80). "Sustainability is a key driver in BAM's business model and strategic decision making" (page 80).

SBM-2Interests and views of stakeholders
Reported

Interests and views of stakeholders

Reference: pages 83, 85, 132, 142.

Stakeholder engagement is covered in chapter 6.1 (page 95). BAM states that in 2025 it "continued to engage with external stakeholders through numerous discussions", summarised in a table covering clients, knowledge institutions, local communities, suppliers and subcontractors, industry bodies, regulators, investors and analysts, NGOs and trade unions, and media, with the processes used and matters discussed for each (page 85).

For own workforce, BAM integrates employees' views through engagement channels, regular surveys and feedback sessions, and through its Works Councils (page 132). Affected communities are addressed through local community engagement on projects, with social value informed by client perspectives (page 142).

SBM-3Material impacts, risks and opportunities and their interaction with strategy and business model
Reported

Material impacts, risks and opportunities and their interaction with strategy and business model

Reference: pages 86, 95, 104, 119, 133.

Material impacts, risks and opportunities from the 2025 double materiality assessment are presented in chapter 6.1 (pages 86-90); each topical chapter repeats its own subset. The company states that "All material impacts, risks and opportunities are closely connected to BAM's strategy and business model" (page 95).

Changes against the prior year: the positive impact of ecosystem services, the energy efficiency opportunity and the climate-risk impact on the land bank are no longer material; the Dutch nitrogen crisis became a material risk and the energy transition a material opportunity (page 81). Interaction with strategy and business model is described for climate (page 104), biodiversity (page 119) and own workforce (page 133); the resilience of the strategy is incorporated by reference from chapter 2.5 (page 95).

IRO-1Description of the processes to identify and assess material impacts, risks and opportunities
Reported

Description of the processes to identify and assess material impacts, risks and opportunities

Reference: pages 81-85; also 105, 114, 122, 146.

BAM updated its double materiality assessment in 2025 "building on the comprehensive assessment conducted in 2023 and the update in 2024". The process had four phases: identification, assessment, processing of results and validation (page 81). 85 internal participants from Group, Netherlands and UK and Ireland took part in dialogue sessions (page 83).

An impact is material if scored 'critical' or 'high' on scale, scope, irremediable character and likelihood; a financial risk or opportunity is material on magnitude and likelihood on the same two-level cut-off (page 82). A stand-back analysis added the Dutch nitrogen risk and the energy transition opportunity as financially material (page 84). Water was discussed and judged not material (page 85). Topic-level processes are described for climate (page 105), pollution (page 114), biodiversity (page 122) and business conduct (page 146).

IRO-2Disclosure requirements in ESRS covered by the undertaking's sustainability statement
Reported

Disclosure requirements in ESRS covered by the undertaking's sustainability statement

Reference: pages 95, 158-162.

"All material disclosure requirements are included in BAM's sustainability statement in chapter 6, in the same sequence as described in ESRS, with the exception of the disclosure for IRO-1, which is disclosed in chapter 6.1. For the reference table of all disclosure requirements, refer to chapter 6.7" (page 95).

The chapter 6.7 table lists the ESRS 2 disclosures (BP-1 to MDR-T) and, by topic, the E1, E2, E4, E5, S1, S3 and G1 disclosure requirements covered, with entity-specific metrics for return on inclusion, social value and data protection (pages 158-161). A separate table lists data points derived from other EU legislation (page 162). The index names disclosure requirements; it does not give page numbers.

E1 – Climate Change

E1-1Transition plan for climate change mitigation
Reported

Transition plan for climate change mitigation

Reference: pages 98-103.

BAM aims "to substantially reduce emissions at a pace consistent with the 1.5°C Paris-compliant trajectory" (page 98). Its decarbonisation targets for Scope 1, 2 and 3 are "verified by the Science Based Targets initiative (SBTi)", most recently updated in January 2025 (page 99). BAM confirms it is not excluded from EU Paris-aligned Benchmarks (page 99).

Levers: electrification of equipment and the car fleet, and replacing diesel with HVO, which reached 56% of construction-site fuel use (54% in 2024) (pages 99-100); low-carbon concrete, recycled steel, lower-temperature asphalt and supplier engagement for Scope 3 (pages 101-102). A Scope 3 forecasting model was built in 2025 but its outputs are not published because assumptions are not yet validated (page 102).

Investment: EUR 60 million in electric equipment in 2025 (2024: EUR 55 million) (page 103). Locked-in emissions are discussed qualitatively, tied to the order book (pages 103-104). Offsetting is not used for targets; up to 10% is foreseen for 2050 (page 103).

E1-2(was covered under ESRS 2 IRO-1)Identification of climate-related risks and scenario analysis
Reported

Identification of climate-related risks and scenario analysis

Back-filled from ESRS 2 IRO-1 and SBM-3 in the FY2025 report (pages 104-105). This disclosure requirement did not exist under the 2023 ESRS the report was prepared against.

BAM assesses physical climate risk project by project. Its climate scan "makes use of the 'klimaateffecten atlas' (climate effects register) which is based on the fourteen climate scenarios of KNMI", themselves based on IPCC scenarios; "The most severe climate scenario used by KNMI and in BAM's climate scan is based on RCP 6.0" (3-4°C by 2100). The scan considers likelihood, magnitude, duration and geospatial coordinates (page 105). In the Netherlands it follows the EU Taxonomy hazard classification; in UK and Ireland it covers chronic and acute risks without a Taxonomy check (page 105).

For the land bank, BAM identified the high-risk part "based on specific scenarios" and found the balance sheet risk not material (page 104). No transition-risk scenario or global temperature projection per scenario is named.

Climate-specific risk identification is also presented under E1-2 (2025 ESRS numbering).

E1-3(was covered under ESRS 2 SBM-3)Resilience in relation to climate change
Reported

Resilience in relation to climate change

Back-filled from ESRS 2 SBM-3, climate section (page 104), and IRO-1 (page 105). This disclosure requirement did not exist under the 2023 ESRS the report was prepared against.

BAM does not present a resilience analysis with scenario results. It states that "BAM's resilience analysis is not based on any critical assumptions or material areas of uncertainty" (page 104).

On capacity to adapt: "Given the nature of the business, BAM is well able to adjust or adapt the strategy in the short-, medium- or long term based on change in context or progress", and no activities were identified that would limit decisions aligned with a climate-neutral transition (page 104). BAM has "adopted climate-resilient infrastructure standards" and engages stakeholders to enhance adaptive capacity (page 104). Climate adaptation in tenders: 89% of A and B tenders had climate risk scans in 2025 against a 100% target for 2026 (page 105).

E1-4(was E1-2)Policies related to climate change mitigation and adaptation
Reported

Policies related to climate change mitigation and adaptation

Reference: page 103.

"A reference to the sustainability policy is in chapter 6.2 covering the sustainability practices in BAM. Further information is also available in the policy statement on the BAM website. The update of the sustainability policy is in progress" (page 103).

The sustainability policy applies to BAM's own operations, commits BAM to the UN Sustainable Development Goals and sets criteria for supplier selection (page 97). BAM also sets a decarbonisation-related target to maintain a CDP Climate A List position (page 105).

E1-5(was E1-3)Actions and resources in relation to climate change policies
Reported

Actions and resources in relation to climate change policies

Reference: page 103; actions described in E1-1, pages 99-103.

The dedicated E1-3 section is brief. It states that "investments and changes have occurred in the governance of the sustainability function throughout the business" and that in 2025 BAM invested in IT systems for sustainability reporting, internal training and additional sustainability resources (page 103).

The substantive climate actions and resources are in the transition plan (E1-1): HVO use at 11 million litres in 2025, EUR 60 million invested in electric equipment, 82% EV share in the lease fleet, and green electricity at 80% of electricity use (pages 99, 103, 106, 108). BAM states that OpEx and CapEx for action plans are included in the financial statements (page 103).

E1-6(was E1-4)Targets related to climate change mitigation and adaptation
Reported

Targets related to climate change mitigation and adaptation

Reference: page 105.

BAM's targets, with SBTi-validated items marked (page 105):

  • Reduce Scope 1 and 2 GHG emission intensity by 80% by 2026 against 2015.
  • Reduce Scope 1 and 2 absolute emissions and intensity by 90% by 2030 against 2015 (SBTi validated).
  • Reduce Scope 3 absolute emissions by 50% by 2030 against 2019 (SBTi validated).
  • Net zero for Scope 1, 2 and 3 (minimum 90% reduction against 2019) by 2050 (SBTi validated).
  • 100% certified green electricity by 2030.
  • Maintain a CDP Climate A List position.

"BAM does not include the offsetting of any carbon emissions" in meeting the 2026 and 2030 targets. Effectiveness is tracked by internal reporting on targets and metrics (page 105).

E1-7(was E1-5)Energy consumption and mix
Reported

Energy consumption and mix

Reference: pages 106-107.

BAM states the share of green electricity is 80% of total electricity use (2024: 64%) (pages 106-107). The energy consumption and mix table (page 107) shows total energy consumption of 331,745 MWh in 2025 against 338,676 MWh in 2024, with total renewable energy of 164,735 MWh (49.7% of the total) against 149,573 MWh (44.2%), and total fossil energy of 167,010 MWh against 189,103 MWh. Energy intensity is 0.05 MWh per EUR of net revenue in both years.

BAM operates in a high climate impact sector and breaks out fossil consumption accordingly (page 106). In the Netherlands, electricity is bought with bundled certificates for Dutch wind power; BAM "currently does not procure green electricity backed by power purchase agreements" (page 106).

E1-8(was E1-6)Gross Scopes 1, 2, 3 and Total GHG emissions
Reported

Gross Scopes 1, 2, 3 and Total GHG emissions

Reference: pages 107-113.

Scope 1 and 2 GHG emissions were 41.7 kilotonnes in 2025 (2024: 48.7), an intensity of 5.9 against 7.5, and 76% below the 2015 baseline of 185.0 kilotonnes (pages 107-108). Direct emissions on a handful of large joint operation projects account for around 30% of Scope 1 and 2 (page 108).

Scope 3 was estimated at 1,496 kilotonnes in 2025 (recalculated 2024: 1,644), "a factor 36 larger" than Scope 1 and 2, mostly purchased goods and services and use of sold products (page 108). Scope 3 is 53% lower than the 2019 baseline, which BAM calls "not representative in terms of BAM's reduction efforts" (page 113). The 2024 figure was recalculated with Exiobase 3.10.1 and an inflation correction (pages 93, 113). Primary data covered 20% of Scope 3; categories 8, 9, 10, 13 and 14 are excluded as not applicable or not material (pages 110, 112).

E1-9(was E1-7)GHG removals and GHG mitigation projects financed through carbon credits
Not Material
E1-10(was E1-8)Internal carbon pricing
Not Material
E1-11(was E1-9)Anticipated financial effects from material physical and transition risks and potential climate-related opportunities
Reported

Anticipated financial effects from material physical and transition risks and potential climate-related opportunities

Reference: page 113; also page 104.

The index lists E1-9 (page 159). BAM discloses a material climate-related opportunity rather than a quantified financial effect: "The energy transition presents a potentially material climate-related opportunity for BAM, driven by the scale and urgency of new infrastructure required to decarbonise the global economy" (page 113).

"Energy transition related revenue were around 15% of total revenue in 2025", one third in UK and Ireland and two thirds in the Netherlands. It covers converter stations, grid upgrades, energy-efficient homes and buildings, EV charging and the partnership with Rolls Royce on small modular reactors (page 113). The physical and transition risk on the land bank was quantified and not deemed material in 2025 (page 104). No physical-risk monetary amounts are given.

E2 – Pollution

E2-1Policies related to pollution
Reported

Policies related to pollution

Reference: page 114.

"While BAM's sustainability policy does not explicitly address pollution, the policy does provide guidance on material use. With the efficient use of materials and use of sustainable alternatives BAM intends to minimise the upstream pollution. BAM is doing research on how this should influence the procurement processes for the purchase of materials."

"External regulations take precedence over internal policies when it comes to pollution control." Local authorities set operating licences that limit production volumes and pollution levels (page 114). The material pollution impact is upstream, in the value chain (page 113).

E2-2Actions and resources related to pollution
Reported

Actions and resources related to pollution

Reference: page 115.

BAM does not report absolute upstream pollution emissions in 2025 because of estimation uncertainty, using procurement spend converted with Exiobase v3.8.2 and the Environmental Cost Indicator to rank impact categories (page 115). Actions rest on three pillars: efficient use of materials, reduction of primary materials such as concrete, steel and asphalt, and research with value chain partners to improve traceability (page 115).

BAM applies a mitigation hierarchy of avoid and reduce, referencing the EU Taxonomy Do No Significant Harm criteria for pollution prevention and control. It states it does not disclose the amount of pollutants emitted through purchased materials in 2025 and "No such material remedial (financial) actions have come to BAM's attention" (page 115).

E2-3Targets related to pollution
Reported

Targets related to pollution

Reference: page 115.

"Pollution is not included as a specific element in BAM's strategy." BAM concluded "that a separate target for upstream pollution is not suitable" and recognises the strong dependency on material use. Upstream pollution is instead addressed through the indirect target to reduce non-biobased virgin materials by 50% by 2030 compared with 2019, focused on concrete, steel and asphalt (page 115). See also E5-3.

E2-4Pollution of air, water and soil
Not Material
E2-5Substances of concern and substances of very high concern
Not Material
E2-6Anticipated financial effects from pollution-related impacts, risks and opportunities
Reported

Anticipated financial effects from pollution-related impacts, risks and opportunities

Reference: page 117.

The index lists E2-6 (page 159). The financial risk is the Dutch nitrogen crisis: "The nitrogen risk in the Netherlands is a financial exposure that potentially affects BAM through a regulatory & policy risk. Dutch courts have ordered the government to cut nitrogen emissions significantly by 2030 to meet EU rules, with potential fines if targets are missed" (page 117).

BAM's nitrogen taskforce monitors legal developments, and nitrogen risk is assessed in tenders to avoid exposure to cancellations. "Current projects face no immediate delays" but permit availability and regional emission ceilings after 2026 are uncertain, and costs are "difficult to estimate today" (page 117). BAM says these risks and opportunities "have no associated assets and no direct link to the financial statements, other than their potential impact on future revenue generation" (page 84). No amount is given.

E4 – Biodiversity and Ecosystems

E4-1Transition plan on biodiversity and ecosystems
Reported

Transition plan on biodiversity and ecosystems

Reference: pages 118-119.

BAM states it "has integrated biodiversity considerations into its corporate strategy and business model" and recognises that land use and land conversion in construction and infrastructure projects pose challenges to species and ecosystems, while restoration can create habitats (page 118). Its approach is aligned with the Kunming-Montreal Global Biodiversity Framework and aims for a nature-positive world by 2050 (page 118).

BAM translated this into "BAM Biodiversity+", launched in 2024, built on ESRS E4, British Standard BS 8583, BREEAM for Infrastructure, CIEEM Biodiversity Net Gain principles and GRI 101 (page 119). BAM is rephrasing its 2030 ambition and plans to finalise new nature targets in 2026 (page 123).

E4-2Policies related to biodiversity and ecosystems
Reported

Policies related to biodiversity and ecosystems

Reference: page 122.

"BAM's sustainability policy references biodiversity but does not include explicit measures for identifying, assessing, managing, or remediating material biodiversity and ecosystem impacts, risks, or dependencies. The current policy is limited to timber." The policy prescribes procuring only certified renewable timber to reduce deforestation risk (page 122).

Biodiversity requirements are part of the stage gate process; all tenders with design in scope are asked to offer biodiversity enhancing measures to the client (page 122). BAM notes it will be subject to the EU Deforestation Regulation, delayed to 30 December 2026, with limited impact expected because it imports timber directly only for its timber housing factory (page 122).

E4-3Actions and resources related to biodiversity and ecosystems
Reported

Actions and resources related to biodiversity and ecosystems

Reference: page 123.

BAM carried out 79 Biodiversity+ assessments in 2025, 62 in UK and Ireland and 17 in the Netherlands (page 123). Efforts focus on minimising negative impacts in the supply chain, protecting nature during construction, and restoring and enhancing nature through delivered assets. An e-learning tailored to project stage was published and best practices are shared through a sustainability library (page 123).

"We do not currently apply biodiversity offsetting." Measures were offered in 84% of large tenders with design in scope in 2025, the first year with consolidated figures (page 123). Examples on owned development sites include bat boxes, swallow boxes, mixed hedgerows, and oil flax and Miscanthus (page 120).

E4-4Targets related to biodiversity and ecosystems
Reported

Targets related to biodiversity and ecosystems

Reference: page 123.

BAM's target is to offer biodiversity enhancing measures in A, B and C tenders with design in scope in 2026, with an ambition to work toward a biodiversity positive impact by 2030 (page 123). The targets are described as in line with the Kunming-Montreal Global Biodiversity Framework. "BAM did not apply ecological thresholds when setting these targets."

BAM dropped its 2026 target on evidenced biodiversity balanced in UK and Ireland because aggregating Biodiversity Net Gain across projects proved infeasible (page 123).

E4-5Impact metrics related to biodiversity and ecosystems change
Reported

Impact metrics related to biodiversity and ecosystems change

Reference: pages 119-121, 123.

The index lists E4-5 (page 159). BAM mapped owned sites against biodiversity-sensitive areas using Integrated Biodiversity Assessment Tool buffer guidance. 47 owned sites lie within 1 kilometre of a biodiversity-sensitive area (2024: 47), of which 14 were actively being developed in 2025; seven offices and depots are within 500 metres (pages 119-121). BAM identifies 21 material sites, and the 14 development sites cover "approximately 500 hectares", described as the theoretical maximum area subject to biodiversity impact (page 120).

"As no biodiversity impact assessments were conducted at individual site level, BAM cannot provide an exact figure for land-use conversion" (page 120). Measures were offered in 84% of large tenders with design in scope (page 123).

E4-6Anticipated financial effects from biodiversity and ecosystem-related impacts, risks and opportunities
Not Material

E5 – Resource Use and Circular Economy

E5-1Policies related to resource use and circular economy
Reported

Policies related to resource use and circular economy

Reference: page 124.

BAM's sustainability policy drives its approach: make efficient use of resources, optimise design to minimise materials, consider biobased (timber) and recycled alternatives while procuring "100% certified sustainable timber", avoid waste and separate remaining streams, and support material passports and circularity assessments (page 124).

The policy covers BAM's own operations and criteria for supplier selection; BAM ensures subcontractors and suppliers have relevant sustainability policies and comply with environmental protection laws (page 124).

E5-2Actions and resources related to resource use and circular economy
Reported

Actions and resources related to resource use and circular economy

Reference: pages 124-125.

Actions include circular design, shown by the wooden housing concept Flow and by cold-use asphalt in the Dutch infrastructure business (page 124). In 2025, Netherlands partners developed a biobased fire protection board from recycled timber waste, and concrete waste is used for flexible groynes along river sides; UK and Ireland developed a plan to re-use waste during projects (page 125).

BAM aimed to set baselines and reduction paths for the largest material categories in 2025; for steel a draft roadmap is finalised, for concrete and timber work is in progress (page 125). "All actions and initiatives as described above are a part of BAM's ongoing operations and therefore have no additional financial resources allocated from either Capex or Opex" (page 125).

E5-3Targets related to resource use and circular economy
Reported

Targets related to resource use and circular economy

Reference: pages 125-126.

Targets include (pages 125-126):

  • By 2030, A, B, C and industrialised projects with design in scope use the material passport and the circularity assessment.
  • A 50% reduction in non-biobased virgin materials by 2030 against 2019 (page 115).
  • A 75% reduction in construction and office waste by 2030 against 2015, by intensity (page 128).

BAM notes the waste targets are "voluntary and not required by legislation", measured against a 2015 baseline that includes later-divested businesses; because targets are intensity-based, the effect is limited (page 126).

E5-4Resource inflows
Reported

Resource inflows

Reference: pages 126-127; restatement on page 93.

Key raw materials are ready-mix concrete, timber, asphalt and steel. Reliability varies: asphalt high, timber medium, concrete and steel limited because they are largely extrapolated from spend (page 126). Reported 2025 ready-mix concrete is 1,659,266 tonnes, of which 4.1% recycled content (68,494 tonnes); the 2024 figure was restated to 1,436,602 tonnes after a prior-period error on pre-fabricated concrete in the Netherlands (page 93).

Certified sustainable timber reached 99.8% in 2025 (99.2% in 2024), with organisational coverage of 91% because timber use in Ireland is excluded (page 127). Recycled steel is 67% of steel use (page 116). Asphalt, steel, timber and total weight tables are on page 127.

E5-5Resource outflows
Reported

Resource outflows

Reference: pages 127-128.

BAM identifies two impacts from resource outflows: a positive impact from circular design in its design process and a negative impact from waste generation (page 127). BAM includes a circularity assessment and material passports in most tender offers, "even if those elements are not explicitly requested by the client" (page 127). Targets for 2030 are tracked in a "Circularity in tenders" table, and BAM is ahead of its interim 50% steps in both divisions (pages 127-128).

Construction and office waste intensity was 7.6 tonnes per EUR million revenue (2024: 8.1), 53.7 kilotonnes in absolute terms, a 64.8% reduction against 2015 (page 128). Waste diverted from landfill was 11% (2024: 22%) (page 128). Waste detail is under E5-5-Waste.

E5-6Anticipated financial effects from resource use and circular economy-related impacts, risks and opportunities
Not Material
E5-5(was E5-5-Waste)Waste
Reported

Waste

Reference: pages 128-130.

BAM generated 1,260.3 kilotonnes of waste in 2025 (940 kilotonnes in 2024). Hazardous waste was 33.8 kilotonnes (47.3 in 2024), none radioactive (page 128). The total percentage of non-recycled waste was 18% in 2025 (41% in 2024); for construction and office waste it was 15.8% (22%) (page 128).

Hazardous waste examples include contaminated soils, bitumen with coal tar, asbestos, impregnated timber and window frames, and glass wool insulation (page 130). Waste tables break out office, construction, excavation and demolition waste by hazardous and non-hazardous, and by reuse, recycling, incineration and landfill (page 130).

Scope covers all waste leaving BAM's sites and offices, mainly from waste tickets and processor data; direct measurement is 99% for excavation and demolition waste and 93% for construction and office waste. Subcontractor waste is excluded except in UK and Ireland (page 129).

S1 – Own Workforce

S1-1Policies related to own workforce
Reported

Policies related to own workforce

Reference: pages 133-134.

BAM's policies cover diversity and inclusion, health and safety, HR Perform and Develop, and the code of conduct. The diversity and inclusion policy aims to "create a truly inclusive culture"; BAM "will not tolerate discrimination, bullying and/or harassment" (page 133). The health and safety policy regards workforce health and welfare as "of the utmost importance" (page 133).

Human rights is an overarching theme, guided by the Universal Declaration of Human Rights, the UN Guiding Principles, the OECD Guidelines and the ILO Declaration; BAM issued Group-wide guidance on human rights and performed a deep dive risk analysis on own workforce and vendors (pages 133-134). The areas of focus are continuous risk assessment, third-party due diligence, training, industry engagement, and monitoring incidents and complaints (page 134).

S1-2(was S1-2 + S1-3)Engagement with own workforce and workers' representatives, existence of channels for own workforce to raise concerns or needs and approaches to remedy
Reported
2023 ESRS S1-2Processes for engaging with own workforce and workers' representatives about impacts
Reported

Processes for engaging with own workforce and workers' representatives about impacts

Reference: page 134.

"Under the responsibility of the CHRO, BAM conducts an engagement survey of its own employees three times per year." Managers see anonymised team scores and are encouraged to discuss them and act; results go to the Executive Committee and are compared with earlier surveys and external benchmarks (page 134). Works Councils involve employees in organisational changes (page 132).

Informal interactions between non-employees and project managers, for example on occupational health and safety impacts, take place at sites (page 134).

2023 ESRS S1-3Processes to remediate negative impacts and channels for own workforce to raise concerns
Reported

Processes to remediate negative impacts and channels for own workforce to raise concerns

Reference: page 134.

The Speak Up procedure sets out how the workforce and other stakeholders can raise concerns, with an external service available 24 hours a day, seven days a week. An investigation procedure describes how reports are investigated and followed up (page 134). "Although BAM does not systematically assesses awareness and trust in these mechanisms, awareness about BAM's Speak Up process is raised" (page 134).

Safety incidents follow a separate registration procedure; investigation team composition depends on severity and includes at least a health and safety professional. Workers are protected against reprisals through anonymous reporting, and retaliation may lead to disciplinary action up to dismissal (page 134).

S1-3(was S1-4)Taking action on material impacts on own workforce
Reported

Taking action on material impacts on own workforce

Reference: pages 134-135.

Actions run through the BAM Experience, delivered by centres of excellence for talent acquisition, talent management and learning, diversity and inclusion, and compensation and benefits (page 134). Progress in 2025 included rolling out strategic workforce planning, upskilling recruiters in inclusive recruitment, and launching a conscious leadership journey (page 135).

On safety, BAM launched a Group-wide programme forming the basis of six Life Saving Rules, eight Safety Principles and Group Safety Standards, strengthened reporting and investigation systems, and introduced a mandatory e-learning and toolbox talks (page 135). For long-term ill health, webinars and Safe and Well sessions covered work-life balance and mental health. Effectiveness is tracked through the engagement survey and strategic people metrics (page 135).

S1-4(was S1-5)Targets related to own workforce
Reported

Targets related to own workforce

Reference: page 135.

"BAM has defined strategic people metrics to manage its material impacts on BAM's own workforce." Several metrics, "such as turnover, absenteeism and action-taking, are tracked internally with no specific targets", forecast from trends and reported quarterly to the Executive Committee (page 135). "Following the interim year of 2025, the company is entering the next phase of targeted objectives scheduled for 2026 and 2030."

A Return on Inclusion audit target of a score of 71 (Gold) or higher by 2030 applies to diversity and inclusion (page 142). The 2025 short-term incentive carries engagement and safety objectives (page 73).

S1-5(was S1-6)Characteristics of the undertaking's employees
Reported

Characteristics of the undertaking's employees

Reference: pages 135-136.

"The total number of employees is 14,167 as at 31 December 2025." The geographic distribution shows regional differences, and a breakdown by contract type shows the structure of the workforce. The information is correlated to personnel expenses in note 7 of the financial statements (page 135).

Employees are split across Division Netherlands, Division United Kingdom and Ireland, and Other, with permanent and temporary contracts by gender. Employee turnover is reported as number of leavers and turnover rate by division (page 136). Reporting principles define own employees as those with a BAM employment contract, and percentages are based on headcount (page 136).

S1-6(was S1-7)Characteristics of non-employee workers
Reported

Characteristics of non-employee workers

Reference: page 137; definitions page 136.

"BAM relies for a large part of its construction activities on non-employees as part of the workforce. Subcontracted work (including material purchase) represents around 70% of BAM's cost base" (page 137).

"As at 31 December 2025, BAM's own workforce consisted of 69% non-employees (2024: 67%), a total of 31,662 (2024: 27,919)" (page 137). Non-employee numbers are derived from the calculations used for hours worked in safety reporting and include assumptions and estimates (page 136). Subcontractors working for joint operation or joint venture partners are not included in own workforce (page 136).

S1-7(was S1-8)Collective bargaining coverage and social dialogue
Not Material
S1-8(was S1-9)Diversity metrics
Reported

Diversity metrics

Reference: pages 137-138.

"In 2025, female representation was 22% across the Group. In division, Netherlands female representation was 17%; in division United Kingdom and Ireland, female representation was 27%" (page 137).

Women make up 50% of the Supervisory Board (2024: 43%), 40% of the Executive Committee (2024: 40%) and 20% of the Senior Leadership Group, 29 women (2024: 16%, 23 women) (page 138). Gender is reported as female and non-female. Initiatives include inclusive recruitment, which BAM says resulted in 3% more women since 2021, and inclusive development, resulting in 5% more women in manager positions (page 138). The Senior Leadership Group is defined as grades F, G and H, and includes non-employees in a management role in Belgium (page 136).

S1-9(was S1-10)Adequate wages
Not Material
S1-10(was S1-11)Social protection
Not Material
S1-11(was S1-12)Persons with disabilities
Not Material
S1-12(was S1-13)Training and skills development metrics
Reported

Training and skills development metrics

Reference: page 138.

The index lists S1-13 (page 160). "Over the past year, 96% of our employees set clear annual goals, an increase from 90% in 2024" (page 138). BAM presents engagement in regular performance reviews by gender and division, and average training hours for all employees, by gender and by division (page 138).

BAM monitors training participation by gender; differences in average hours "are driven primarily by role profiles and mandatory training requirements linked to those roles, rather than unequal access to learning". All employees have equal access to learning resources including StudyTube, and 96% completed the People and Development section of the performance cycle (page 134).

S1-13(was S1-14)Health and safety metrics
Reported

Health and safety metrics

Reference: pages 139-140; phase-in page 93.

BAM reports a company-specific incident frequency (accidents with absence of one day or more per million hours worked), IF BAM for own employees and IF Total including non-employees, and the ESRS S1-14 metrics: fatalities, recordable accidents with and without lost time and their rate, days lost, and management system coverage (page 139). "All subsidiaries of BAM comply with the ISO 45001:2018 standard" and all employees and non-employees are covered (page 139).

BAM sees safety performance improving against 2024 (page 139). Work-related ill health datapoints, number of cases and days lost, are omitted using the ESRS "Quick Fix" phase-in and "will be required in 2027" (page 93). Worked hours for non-employees are partly estimated (page 140).

S1-14(was S1-15)Work-life balance metrics
Not Material
S1-15(was S1-16)Compensation metrics (pay gap and total compensation)
Reported

Compensation metrics (pay gap and total compensation)

Reference: page 141.

BAM reports the unadjusted gender pay gap between female and non-female employees. "The average pay of female employees is 17% less than the average pay of non-female employees. Calculations using a median instead of average show a pay gap of 16%" (page 141). The gap is "largely attributable to the distribution of female and non-female employees across the organisation", mainly under-representation of women in higher paid roles.

Pay is base salary plus the value of the company car benefit on 5 April 2025, plus bonuses received between June 2024 and May 2025, recalculated to an hourly rate; data for 99.2% of employees is included (page 141). BAM is working on a harmonised job grading framework and an adjusted methodology ahead of the EU pay transparency directive (page 141).

S1-16(was S1-17)Incidents, complaints and severe human rights impacts
Not Material

S3 – Affected Communities

S3-1Policies related to affected communities
Reported

Policies related to affected communities

Reference: page 142.

BAM covers affected communities through an entity-specific social value topic under S3. "Social value is one of the topics in BAM's sustainability strategy and is explicitly mentioned in BAM's Group Sustainability Policy", with responsibilities to commit to a positive social contribution, engage with the communities in which BAM works (for example by using local agencies, labour and workforce), and tackle social issues identified by clients, employees and local communities (page 142). More specific commitments are in social value policies for UK and Ireland and for the Netherlands.

S3-2(was S3-2 + S3-3)Engagement with affected communities, existence of channels for affected communities to raise concerns or needs and approaches to remedy
Partly reported
2023 ESRS S3-2Processes for engaging with affected communities about impacts
Reported

Processes for engaging with affected communities about impacts

Reference: page 142.

"BAM engages with affected communities on a project level through its general project approach that includes local community engagement. In most cases, the project manager or a dedicated social value manager is responsible for ensuring this engagement happens." Engagement often occurs by or in collaboration with the client, and the approach is informed by local obligations (page 142).

Local communities are also engaged through in-person meetings, information markets, guest lectures, open office hours, the BouwApp and voluntary work, on safety, noise and other disturbances from construction works (page 85).

2023 ESRS S3-3Processes to remediate negative impacts and channels for affected communities to raise concerns
Not Material
S3-3(was S3-4)Taking action on material impacts on affected communities
Reported

Taking action on material impacts on affected communities

Reference: page 143.

BAM's actions to positively impact communities are "carried out directly by BAM and in collaboration with supply chain partners", before and during construction and in the legacy of completed projects. Each division follows a slightly different social value approach, usually guided by a Local Needs Analysis or client requirements (page 143).

BAM is part of the Considerate Constructors Scheme in the UK and Bewuste Bouwers in the Netherlands. In the UK, 46 projects were registered in 2025 (2024: 53) with an average audit score of 43.7 against an industry average of 40.9; in the Netherlands, 53 sites were registered (2024: 69) with an average score of 3.6 against 3.4 nationally, on a new auditing methodology since April 2025 (page 143).

S3-4(was S3-5)Targets related to managing material negative impacts, advancing positive impacts, and managing material risks and opportunities
Reported

Targets related to managing material negative impacts, advancing positive impacts, and managing material risks and opportunities

Reference: pages 143-145.

Targets differ by division because social value legislation differs. Netherlands: deliver 5% social value on top of contractual Social Return on Investment obligations in 2026; the 2025 assessment of BAM Infra Netherlands showed delivery of 112% of SROI obligations (EUR 13.9 million) (page 144). UK and Ireland: deliver 35% social value, measured as Social and Local Economic Value (SLEV) as a percentage of revenue, in 2026; the 2025 result was 19.9% (2024: 15.6%), with data in 12 of 13 BAM TOMs (page 144).

Social value contributions are "currently not defined for the Belgian part of the business" (page 143). The UK and Ireland method uses 13 core measures from the 2022 national TOMs framework (page 145).

G1 – Business Conduct

G1-1Business conduct policies and corporate culture
Reported

Business conduct policies and corporate culture

Reference: pages 146-148.

"The BAM Code of Conduct and underlying procedures describe the expected behaviours" on BAM values, safety, human rights, preventing bribery and corruption, and protection of data and privacy. It applies to all employees including contract and temporary workers, and new employees sign a statement confirming compliance (page 146). An anti-bribery and corruption policy states BAM "does not tolerate bribery and corruption"; in 2025 BAM extended its code, policies and training for the UK Economic Crime and Corporate Transparency Act (page 147).

In 2025, 211 suspicions of misconduct were reported (2024: 148), with no fines, penalties or compensation for damages. The Speak Up procedure includes Whistleblower Directive requirements, with a third-party-operated line open 24/7 (page 147). Vendors are bound by the Vendor Code of Conduct (pages 147-148).

G1-2(was G1-2 + G1-3)Actions related to business conduct
Partly reported
2023 ESRS G1-2Management of relationships with suppliers
Not Material
2023 ESRS G1-3Prevention and detection of corruption and bribery
Reported

Prevention and detection of corruption and bribery

Reference: page 148; training coverage page 147.

"Compliance risk assessments are conducted as part of BAM's risk management process." BAM obtains its main revenue in countries with a low or very low risk of corruption on the Transparency International Corruption Perception Index, and quarterly risk assessments check compliance developments against a "very low risk appetite for corruption and bribery risks", with results reported quarterly to the Executive Committee (page 148).

Vulnerable functions, namely commercial and project management, finance, procurement and the Executive Committee, cover around 40% of employees and receive an in-depth e-learning on corruption, bribery and fraud. In an investigation, the investigators are separate from the chain of management involved. The topic also sits in the code of conduct and is monitored by compliance officers (page 148).

G1-3(part of MDR-T/GDR-T disclosures)Targets related to business conduct
Reported

Targets related to business conduct

Back-filled from the business conduct chapter (pages 147-148) and the MDR-T statement (page 96). G1-3 became a standalone DR only in the 2025/2026 ESRS; this report was prepared under the 2023 ESRS.

BAM sets a numeric training target: "BAM targets a 95% completion score for the training, to allow for fluctuations due to new people joining the company" (page 147). A Training table gives coverage against target for the code of conduct, corruption and bribery, and data privacy e-learnings, and BAM states performance is in line with target (pages 147-148). The mandatory group covers roughly 70% of employees; site employees without online access are trained through toolbox meetings (page 147).

Per MDR-T, where no target exists BAM tracks effectiveness "via quarterly reporting to the Executive Committee on the performance of sustainability metrics" (page 96).

G1-4Incidents of corruption or bribery
Reported

Incidents of corruption or bribery

Reference: page 148.

BAM reports the number of convictions and the amount of fines for violation of anti-corruption and anti-bribery laws in a table (page 148). "There were no fines, penalties or compensation for damages related to corruption and bribery in 2025. This includes incidents involving actors in BAM's value chain in which BAM or its employees were directly involved."

Separately, 211 suspicions of misconduct were reported in 2025 (2024: 148), assessed and sanctioned where needed up to dismissal; they dealt with issues such as inappropriate use of company assets, safe working environment and privacy breaches (page 147). The entity-specific data protection disclosure reports a limited number of privacy breaches reported to external authorities and no fines (page 148).

G1-5Political influence and lobbying activities
Not Material
G1-6Payment practices
Not Material