JM AB
Material Topics
Sustainability statement, in full
The complete text of JM AB’s FY2025 sustainability statement is held here – 47 pages, captured from the published report. Every disclosure below also links to its own passage.
Value chain diagram – from the 2025 report (click to enlarge)
ESRS 2 – General Disclosures
GOV-1The role of the administrative, management and supervisory bodiesReported
The role of the administrative, management and supervisory bodies
Reference: pages 41-42.
The Board has nine members, seven of them non-executive, and all non-executive members are independent of the company, its management and major shareholders. Gender distribution on the Board is 67 percent men and 33 percent women. Two employee representatives and two deputies sit on the Board with the same rights and obligations as other members (page 42).
The Board is "ultimately responsible for control and supervision of sustainability work", sets policies, targets and action plans and approves incentive programmes. The Audit Committee oversees production of the annual and sustainability report and handles the operational dialogue with the Sustainability department. The President and CEO has ultimate responsibility for establishing policies, targets and action plans and for implementing all policies, while the Sustainability department develops strategies and targets and decision data on impacts, risks and opportunities (page 41).
Governance processes and internal controls sit in the Group's business management system (page 42). The text gives executive management as nine officers, 56 percent men and 44 percent women (page 42); S1-9 on page 76 gives a different split (see S1-9).
GOV-2Information provided to and sustainability matters addressed by the undertaking's administrative, management and supervisory bodiesReported
Information provided to and sustainability matters addressed by the undertaking's administrative, management and supervisory bodies
Reference: page 42.
JM's head of sustainability updates executive management and the Audit Committee quarterly and the Board twice a year on material impacts, risks and opportunities, the implementation of due diligence, and the results and effectiveness of policies, targets and measures (page 42).
During 2025 the Audit Committee and Board focused on the Group's first sustainability report under CSRD. The material topics addressed were climate impact, energy consumption and climate adaptation; resource use and waste management; employee working conditions and gender diversity; working conditions and gender equality in the value chain; customer access to quality information; and work against corruption. These form the basis of the sustainability strategy. Impacts, risks and opportunities are integrated into strategic initiatives and the Group's risk process, and JM states it made no trade-offs between its strategy and its material impacts, risks and opportunities during the year (page 42).
GOV-2(was GOV-3)Integration of sustainability-related performance in incentive schemesReported
Integration of sustainability-related performance in incentive schemes
Reference: page 42.
Executive management works under sustainability-related incentive programmes whose contracts carry sustainability targets. Two targets apply: one climate-related, linked to the overall target for emission reductions upstream in the value chain and within construction projects (E1-4), and one on the average amount of waste, a sub-target to the Group's overall waste target (E5-3).
The share of variable remuneration linked to sustainability-related targets and/or impacts is 10 percent, and the share linked to the overall climate targets is 3 percent. The Compensation Committee prepares the design of incentive programmes and the Board approves it; the Annual General Meeting approves the guidelines for senior executives. Other employees entitled to variable remuneration are also covered by incentive programmes with sustainability-related targets (page 42). The report refers to the Corporate Governance Report (pages 118-124) and the remuneration report for further detail.
GOV-3(was GOV-4)Statement on due diligenceReported
Statement on due diligence
Reference: pages 42-43.
JM states that, as set out in its sustainability policy and its Code of Conduct for Suppliers and Subcontractors, it strives to minimise the risk that its operations directly or indirectly cause harm to people or the environment. Due diligence follows the process described in the UN Guiding Principles on Business and Human Rights and the OECD Guidelines for Multinational Enterprises (page 43).
A table maps the five core elements of due diligence to where each is addressed in the report. Examples: integrating due diligence into governance and strategy maps to GOV-2, GOV-3 and SBM-3; identifying and assessing negative impacts maps to IRO-1; taking action maps to MDR-A and the thematic actions (E1-1, E1-3, E5-2, S1-3, S1-4, S2-3, S2-4, S4-3); and tracking effectiveness maps to MDR-M, MDR-T and the thematic metrics and targets, including E1-4 to E1-6, E5-3 to E5-5, S1-5 to S1-7, S1-9, S1-14, S1-17 and S2-5 (page 42).
GOV-4(was GOV-5)Risk management and internal controls over sustainability reportingReported
Risk management and internal controls over sustainability reporting
Reference: page 43.
JM identified, through a risk assessment, the environmental and social topics and data critical for its reporting, based on relevance and materiality under the double materiality assessment. The assessment is limited to quantitative data on material subtopics and sub-subtopics and is used to select the first metrics for internal control, prioritised by data complexity, degree of manual handling, risk of calculation error and process maturity.
The main risks named are a high degree of manual data handling, manual transfers between internal systems and the lack of the "four eyes principle". Mitigation is documented in a risk and control matrix, with controls such as reviewing data calculations, plausibility assessments of data bases and approval of the report content. System support is used for most quantitative data points, and third-party data such as supplier environmental product declarations is checked for reasonableness. Identified risks and deficiencies in internal controls are reported on an ongoing basis to the Board's Audit Committee (pages 43-44).
SBM-1Strategy, business model and value chainReported
Strategy, business model and value chain
Reference: pages 43-45.
JM's strategy and business model are based on housing development with a focus on quality, profitability and sustainability. It offers newly produced tenant-owned units, freehold properties and apartments, rental units, student housing, residential care units, commercial premises and contracting services to private individuals, investors and public actors in Sweden, Norway and Finland (page 43).
The value chain graphic and text (pages 44-45) describe three parts: upstream (purchase of construction materials such as concrete, steel and wood from a limited number of mainly Nordic and European suppliers), own operations (new construction, largely with JM's own skilled workers, with all own residential units certified to Nordic Swan Ecolabel), and downstream (sale and use of completed residential units).
Sustainability-related targets include reducing greenhouse gas emissions related to construction projects by 85 percent by 2030 versus 2022, buildings in pre-construction with calculated energy performance better than national regulations, and waste of no more than 15 kg/m2 gross floor area on completed projects by 2030 (page 43). JM names the main challenge to its sustainability strategy as primarily financial (page 43).
SBM-2Interests and views of stakeholdersReported
Interests and views of stakeholders
Reference: pages 45-46.
JM's stakeholder dialogue is based on identified needs and views and carried out through relevant channels. Management and supervisory bodies receive stakeholder views through the annual customer satisfaction index survey (results presented to executive management), annual employee surveys, continuous dialogue with shareholders, investors and banks, monitoring of suppliers and partners in the Quality and Environmental Council, and ongoing dialogue with municipalities and local stakeholders (page 45).
A table of five key stakeholder groups (customers, employees, shareholders/investors/banks, suppliers and partners, and society including municipalities) sets out each group's primary interest, dialogue channels, how the aspects are managed and the purpose of the dialogue (page 45). The report then explains how the interests of own workforce (S1), value chain workers (S2) and consumers (S4) feed into the business model and strategy, concluding that JM manages these issues satisfactorily within its existing business model without structural changes (pages 45-46).
SBM-3Material impacts, risks and opportunities and their interaction with strategy and business modelReported
Material impacts, risks and opportunities and their interaction with strategy and business model
Reference: pages 46-48.
A table (page 47) lists the material impacts, risks and opportunities by standard and value chain position. E1: climate change adaptation (risk), climate change mitigation (negative impact) and energy (negative impact). E5: resource inflows (negative impact and a risk) and waste (negative impact). S1: gender diversity, health and safety, and measures against violence and harassment (all negative impacts). S2: gender equality and equal pay (potential negative impact) and health and safety (actual negative impact). S4: access to quality information (positive impact). G1: corruption and bribery (a potential negative impact and a risk).
Page 48 explains how the business model drives the impacts, notes that JM "has not identified any current financial effects" of the material risks, and records that a climate resilience analysis was conducted with the climate risk analysis (see E1 SBM-3, page 61). Anticipated financial effects (SBM-3 paragraph 48e) are omitted under the ESRS 1 Appendix C phase-in (page 41).
Climate-specific risk identification and scenario analysis is also presented under E1-2 (2025 ESRS numbering), and resilience under E1-3 (2025 ESRS numbering).
IRO-1Description of the processes to identify and assess material impacts, risks and opportunitiesReported
Description of the processes to identify and assess material impacts, risks and opportunities
Reference: pages 48-50.
JM's double materiality assessment is an annual process, with a cross-functional workshop review each year and a broader stakeholder dialogue every three years. The first assessment was carried out in 2024 and reviewed in 2025, with two changes: climate change adaptation became a material risk, and the positive impact previously reported under S3 (Affected communities) moved to S4 because it falls on end customers (page 48).
Impacts are scored on scale, scope, recoverability (negative impacts only) and probability, with human rights topics always given 100 percent probability. A negative impact is material at 50 percent or more of the maximum outcome and a positive impact at 33 percent or more; JM states these thresholds were set internally (page 49). Financial materiality uses turnover bands of under SEK 100 million, SEK 100-500 million and over SEK 500 million multiplied by probability, with a result of 67 percent or more of the maximum of 12 counting as financially material (page 49). Results were approved by the steering group, executive management, the Audit Committee and the Board (page 48).
Topic-specific processes for E1, E5, G1 and the non-material E2-E4 topics follow on pages 49-50.
IRO-2Disclosure requirements in ESRS covered by the undertaking's sustainability statementReported
Disclosure requirements in ESRS covered by the undertaking's sustainability statement
Reference: pages 50-53.
JM prints a "Content index and list of data points derived from other EU legislation" (pages 51-53) listing, by standard, the disclosure requirements and associated datapoints covered by the sustainability report, with a page reference for each and the Regulation on Sustainability Disclosures, Pillar 3, Reference Value Regulation and EU climate law columns. Entries without a page carry "Non-material", "Not applicable" or "Phase-in item".
The index covers ESRS 2, E1, E5, S1, S2, S4 and G1, with E2, E3, E4, S3 and some individual datapoints marked non-material. JM explains that it mapped what must be provided regardless of materiality under ESRS 2 and the IRO-1 requirements of the thematic standards, then identified the disclosure requirements dependent on the outcome of the double materiality assessment, and added unit-specific disclosures not covered by ESRS paragraphs (page 50).
E1 – Climate Change
E1-1Transition plan for climate change mitigationReported
Transition plan for climate change mitigation
Reference: pages 61-62.
JM's goal is an 85 percent reduction in greenhouse gas emissions related to construction projects by 2030 compared with 2022. The target covers the upstream value chain and own operations to the end of production and is an intensity target because absolute impact varies with the number of completed units. JM assesses the target as in line with limiting warming to 1.5 °C and scientifically based, but states it "has not been verified by a third party" (pages 61-62).
Since 2023 JM has had a Group-wide transition plan with three focus areas: material and construction choices, transports and production, and climate management and governance. Material manufacturing accounts for approximately 85 percent of the climate impact of the construction process, so climate-improved concrete is the central lever (page 61). The plan was decided by executive management and adopted by the Board (page 62).
JM reports that investments are mainly internal time and made without significant impact on Capex and Opex, that its downstream locked-in emissions arise from use-phase energy, and that it is not excluded from EU Paris-aligned benchmarks (page 62). Progress: a 17 percent reduction versus 2022 in Sweden in 2024, and in 2025 intensity of 268 kg CO2e/m2 GFA in Sweden and 280 in Finland, both at or under target (page 62).
E1-2(was covered under ESRS 2 IRO-1)Identification of climate-related risks and scenario analysisReported
Identification of climate-related risks and scenario analysis
Back-filled from ESRS 2 IRO-1 (pages 49-50) and the E1 SBM-3 section (page 61), where this content is disclosed in the FY2025 report. This disclosure requirement did not exist under the 2023 ESRS the report was prepared against.
Risk identification. JM identifies both physical and transition risks across the value chain. Physical risks named are increased extreme weather, changed precipitation patterns, elevated water levels and landslides, tested with RCP 4.5 and RCP 8.5. Transition risks named are higher costs for energy, fuels and raw materials, changing regulation, limited access to capital, changing insurance terms and stakeholder requirements, tested with RCP 2.6 and RCP 4.5 (page 61). A tool based on the Climate Vulnerability and Risk Assessment method assesses physical risk at sites JM intends to acquire (page 50).
Scenarios. At least once a year a cross-functional working group including executive management performs a scenario analysis based on TCFD recommendations. Classification uses SMHI impact analysis for Sweden with a 10-year perspective, based on IPCC RCP 2.6-8.5 (page 49). RCP 2.6 was not applied to physical risk and RCP 8.5 was not applied to transition risk because those risks were judged limited (page 50). The report states no global temperature projection per scenario.
E1-3(was covered under ESRS 2 SBM-3)Resilience in relation to climate changeReported
Resilience in relation to climate change
Back-filled from ESRS 2 SBM-3 (page 48) and the E1 SBM-3 section (page 61), where this content is disclosed in the FY2025 report. This disclosure requirement did not exist under the 2023 ESRS the report was prepared against.
JM states it conducted a resilience analysis of the Group's ability to manage material impacts, risks and opportunities in conjunction with the climate risk analysis, to ensure its strategy and business model are robust (page 48).
Results (page 61). The greatest uncertainties are the pace and scope of policy instruments, access to materials with lower climate impact, technical innovation and raw material cost developments. JM nonetheless considers itself to have good adaptability through established investment and project management processes, continuous skills development and structured supplier dialogue, which allows rapid strategy adjustment. During the year it strengthened this capacity through collaboration with innovative suppliers and the decision to introduce level 3 climate-improved prefabricated concrete.
Strategic focus differs by horizon: in the medium term (2-5 years) reducing emissions from concrete, and in the long term (over five years) new technologies, materials and structural systems. Financial effects are assessed as intangible in the short term (page 61).
E1-4(was E1-2)Policies related to climate change mitigation and adaptationReported
Policies related to climate change mitigation and adaptation
Reference: page 62.
JM's Group-wide sustainability policy covers climate and states that JM's climate-impacting emissions upstream and in construction projects must be close to zero by 2030, in line with the Group's climate targets. The policy takes a holistic value chain perspective in the climate roadmap, with focus on climate-improved concrete, steel with reduced climate impact and resource-efficient use of materials and energy.
The policy relates to all three material climate topics: climate change mitigation (using materials and methods that reduce environmental impact), energy (efficiency initiatives across the value chain and increased renewable energy) and climate adaptation (mapping risks and climate-adapting buildings for long-term use). It is available on JM's public website, and GOV-1 describes the division of responsibility for JM's policies (page 62).
E1-5(was E1-3)Actions and resources in relation to climate change policiesReported
Actions and resources in relation to climate change policies
Reference: pages 63-64.
A table of implemented and planned transition plan measures with timelines (page 63) covers: the 2025 decision to introduce Level 3 climate-improved prefabricated concrete (2025-2026), product development for materials and construction choices (2026-2030), collaboration with innovative suppliers of prioritised materials (2025-2030), review of fossil-free transport requirements and electrification of heavy machinery (2025-2030), an incentive model to reduce climate impact in projects (2025-2027), a climate baseline for Norway and Finland (2025), and internal carbon pricing in decision documents (2026-2027).
JM states "there is currently no quantified value for the emission reductions" because the outcome depends on value chain developments, and flags dependence on fossil-free fuels, electrified infrastructure and grid capacity (page 63). Downstream, JM builds energy-efficient homes and began developing dismantling principles under Nordic Swan Ecolabel Generation 4 (page 63).
Adaptation: in 2025 JM introduced the CVRA method for all projects entering production and states it "has not reserved or incurred significant costs related to climate adaptation measures" (page 64).
E1-6(was E1-4)Targets related to climate change mitigation and adaptationReported
Targets related to climate change mitigation and adaptation
Reference: pages 64-65.
JM's greenhouse gas target is a reduction of 85 percent per m2 of gross floor area by 2030 compared with 2022, equal to 50 kg CO2e/m2 GFA or less for modules A1-A5 at the start of production, excluding earthworks. The 2022 baseline intensity is 0.336 tCO2e/m2 GFA. The interim 2025 target is 0.272 tCO2e/m2 for Sweden and Norway and 0.294 for Finland, against achieved 0.268 (Sweden), 0.280 (Finland) and 0.280 (Norway), so Norway marginally exceeded its interim target (page 64).
The target covers 100 percent of Scope 1 and 2 and 83 percent of Scope 3 emissions, 84 percent of total emissions in 2025. JM states it has not used any climate scenario to arrive at the main drivers (page 64) and that the target has not been externally reviewed (page 65).
A second target is that buildings in pre-construction have calculated energy performance better than national regulations; 29 of 30 buildings met it in 2025 (page 65). JM has set no specific climate adaptation target and relies on risk assessment of projects and Nordic Swan Ecolabel certification (page 65).
E1-7(was E1-5)Energy consumption and mixReported
Energy consumption and mix
Reference: page 65.
JM's energy consumption consists primarily of electricity and district heating, with mostly renewable electricity secured through framework agreements. Total energy consumption in 2025 was 47,911 MWh, of which 26,235 MWh (55 percent) was fossil and 21,677 MWh (45 percent) renewable. Purchased energy from fossil sources was 23,659 MWh and from renewable sources 20,549 MWh, with a further 1,128 MWh of renewable fuel consumption (page 65).
All of JM's revenue comes from a sector with high climate impact (NACE code F), giving energy intensity of 4.48 MWh per SEK million of net turnover (SEK 10,691 million). Where origin data from energy suppliers was missing, JM assumed the energy was fossil. JM states the metrics were not reviewed by an external party (page 65).
E1-8(was E1-6)Gross Scopes 1, 2, 3 and Total GHG emissionsReported
Gross Scopes 1, 2, 3 and Total GHG emissions
Reference: pages 66-67.
JM reports total greenhouse gas emissions for 2025 of 105,051 tCO2e, based on a life cycle analysis of the Group's projects and buildings, with Scope 3 making up the large majority (page 66). Emissions relative to revenue are about 10 tCO2e per SEK million on both location-based and market-based Scope 2 (page 66). Biogenic emissions from renewable fuels are 37 tCO2e in Scope 1; JM cannot split biogenic emissions in Scopes 2 and 3 (page 66).
JM further developed its method in 2025: most categories now use all ongoing projects in the year rather than completed projects, and categories 3.11 (use of sold products) and 3.12 (final processing) are reported for the first time. It did not recalculate the 2022 baseline, judging the difference insignificant (page 66). Excluding 3.11 and 3.12, 2025 totals are 89,835 tCO2e location-based and 90,358 tCO2e market-based (page 66).
The method follows the GHG Protocol with operational control; about 61 percent of Scope 3 calculations use primary data, and the calculations were not externally reviewed (page 67).
E5 – Resource Use and Circular Economy
E5-1Policies related to resource use and circular economyReported
Policies related to resource use and circular economy
Reference: page 69.
JM's Sustainability Policy guides its work on resource management and the material cycle, regulating responsible resource use, waste minimisation and promotion of a circular economy. Through it JM undertakes to use resources responsibly by reducing the need for newly extracted materials, promoting reuse during dismantling and between projects, and increasing the share of recycled materials. Waste must be minimised and all materials procured with respect for human rights and minimised environmental impact.
JM acknowledges the policy does not explicitly prioritise waste prevention over material recycling, but says this is done in practice through recycling inventories and collaboration with external parties on take-back and recycling. Regions share over-ordered materials between projects, with intermediate storage at JM's logistics centre. The policy is published on JM's website and GOV-1 describes responsibility for policies (page 69).
E5-2Actions and resources related to resource use and circular economyReported
Actions and resources related to resource use and circular economy
Reference: page 69.
JM has a Group-wide action plan covering all submarkets, spanning early project planning through pre-construction, production and handover. Actions in 2025 fall into three groups (page 69).
Waste prevention: minimising markups when purchasing materials, identifying materials with a high risk of spillage, including return requirements for over-ordered products in framework agreements, and planning to reduce disposable packaging through supplier requirements. Reuse: analysing materials suited to reuse such as temporary wooden structures, starting principles for dismantling products and materials under Nordic Swan Ecolabel Generation 4, and developing a guide for reuse inventories when dismantling existing construction. Recycling: a completed test project casting concrete blocks from concrete waste, training waste managers at project start, removing "combustible, landfill and mixed" as a standard fraction, and mapping the share of recycled steel in purchased materials.
In 2026 JM will consider guidelines on where recycled materials can replace new ones. The measures also support the EU Taxonomy circular economy criterion (page 69).
E5-3Targets related to resource use and circular economyReported
Targets related to resource use and circular economy
Reference: pages 69-70.
JM's target is to reduce the amount of waste generated to 15 kg/m2 gross floor area by 2030. Waste intensity was 34 kg/m2 in the 2023 base year and 30 kg/m2 in 2025, so the 2025 figure is down from the base year but about halfway to the 2030 level (page 69). The target applies to new construction in all submarkets and covers resource outflow of waste from own operations. It is linked to executive remuneration through a waste sub-target (page 42).
JM has set no targets for resource inflows because it needs more data on purchased materials. In 2025 it mapped the share of recycled steel in purchases and intends in 2026 to review a target for that share (page 69). Waste data is based solely on primary data from each project's waste contractor, quality assured monthly, and the target was formulated internally without external stakeholders (page 70).
E5-4Resource inflowsReported
Resource inflows
Reference: page 70.
JM's material resource inflows are the building materials, transport packaging, machinery and equipment needed for construction. The report lists main materials including concrete, prefabricated roofs, facade materials, structural timber, insulation, hollow core decks, reinforcement, plaster, steel, aluminium, flooring and windows (page 70).
Swedish and Norwegian projects in 2025: total material weight 801,520 tonnes, of which 15,977 tonnes (2 percent) recycled, and 95 percent of organic material certified FSC or PEFC. Finnish projects completed in 2025: 92,294 tonnes, of which 3,763 tonnes (4 percent) recycled. Swedish and Norwegian data cover materials purchased in the year; Finnish data cover total purchases for projects completed in the year because of system limits. The data come mainly from supplier information and environmental product declarations, with some supplier estimates of recycled share, and were not externally reviewed (page 70).
E5-5Resource outflowsReported
Resource outflows
Reference: page 70.
JM's material resource outflows are the waste fractions from construction waste in new construction: incineration, landfill, electrical waste, hazardous waste, gypsum, glass, iron and metal, mineral masses, mineral wool, paper, park and garden waste, plastic, and wood (page 70). Waste is weighed by the waste contractor at each facility, compiled monthly into a central database and checked against project logs.
JM reports no radioactive waste and notes that soils going to landfill are excluded from the compilation (page 70). Quantified waste figures are given in the waste disclosure (see E5-5 Waste).
E5-5(was E5-5-Waste)WasteReported
Waste
Reference: page 70.
JM generated 16,138 tonnes of waste in 2025, of which 138 tonnes was hazardous. Of the total, 12,239 tonnes was diverted from disposal: 12,131 tonnes non-hazardous (6 tonnes prepared for reuse, 3,077 tonnes material recycling, 9,048 tonnes other recycling) and 108 tonnes hazardous, all material recycling. Waste directed to disposal was 3,899 tonnes: 3,869 tonnes non-hazardous (2,566 tonnes incineration, 299 tonnes landfill, 1,004 tonnes other disposal) and 30 tonnes hazardous, all incineration (page 70).
Non-recycled waste amounts to 3,899 tonnes, or 24 percent of the total. JM has no radioactive waste, excludes soils sent to landfill, uses primary data with no estimates, and states the metrics were not reviewed by an external party (page 70).
S1 – Own Workforce
S1-1Policies related to own workforceReported
Policies related to own workforce
Reference: page 73.
JM regulates its work on human rights for its own workforce mainly through the work environment policy and the policy against abusive conduct, sexual harassment and discrimination. The work environment policy commits JM to a healthy, safe and secure workplace with the goal of an injury-free workplace, supported by a management system for preventing workplace accidents. The harassment policy commits JM to eliminating all forms of harassment and discrimination and guaranteeing equal rights regardless of gender, identity, ethnicity, religion, disability, sexual orientation or age.
The policies cover the entire workforce in all geographies, are reviewed annually and are enforced through training, salary surveys, statistical monitoring, incident reporting and case management. The Code of Conduct is part of employment contracts. Through the Sustainability Policy JM undertakes to comply with the UN Guiding Principles, the ILO Declaration and the OECD Guidelines, but the policy does not explicitly cover human trafficking, forced labour or child labour. JM states it has no policy documents on contact with, and remediation for, employees (page 73).
S1-2(was S1-2 + S1-3)Engagement with own workforce and workers' representatives, existence of channels for own workforce to raise concerns or needs and approaches to remedyReported
Processes for engaging with own workforce and workers' representatives about impacts
Reference: page 73.
JM engages employees and their representatives through continuous discussion to ensure compliance with policies and the Code of Conduct and to identify deviations early. The HR Director and the Occupational Health and Safety Manager are responsible for operational processes. The Ethical Council, made up of the HR Director, Chief Legal Counsel and the internal audit officer, handles, investigates and follows up matters on abusive conduct, discrimination and sexual harassment.
Engagement takes place through monthly meetings with main union representatives, local discussions, quarterly central safety committee meetings, annual employee surveys, goal and development discussions and salary negotiations. If a risk or negative impact is identified, affected employees are involved in analysing the incident. Effectiveness is monitored through the employee survey (page 73).
Processes to remediate negative impacts and channels for own workforce to raise concerns
Reference: pages 73-74.
JM follows a structured method to investigate causes, act and remediate when misconduct is reported. Remediation mainly means resolving the problem and putting in preventive measures, but may include legally dictated damages, and occupational health care offers conversational support (page 73).
Employees can report through the Whistlelink whistleblower system, the BIA and Dalux work environment systems or the annual employee survey, all accessible to employees and subcontractors including by mobile application. Every case registered in BIA or Dalux undergoes root cause analysis with an action plan. Cases of discrimination, harassment and abusive conduct are handled directly by the HR Director and the Ethical Council. Effectiveness is tracked through the employee survey, which also tests whether employees know the channels. Retaliation against whistleblowers is prohibited by law, but JM has no policy that specifically says so (page 74).
S1-3(was S1-4)Taking action on material impacts on own workforceReported
Taking action on material impacts on own workforce
Reference: page 74.
All reported near misses, accidents and risk observations are investigated by the work environment department through root cause analysis with the employees and safety representatives involved, and action plans are shared across workplaces. An annual employee survey on the physical and psychosocial work environment forms the basis for action plans at department and Group level (page 74).
Safety actions include digitalised enrolment procedures, developed fall protection and lifting procedures, new construction hoist procedures, vibration monitoring and e-learning on noise, clarified safety representative roles and stronger fire protection. Gender equality actions include adapted work clothing, changing rooms and menstrual-equipped toilets, manager training in recruitment and leadership planning, and gender equality training. Against harassment and discrimination JM updated its processes, runs an annual Safety Week, has support functions in production and launched psychological safety training. Effectiveness is monitored through the annual employee survey and goal and performance reviews (pages 74-75).
S1-4(was S1-5)Targets related to own workforceReported
Targets related to own workforce
Reference: pages 74-76.
JM has four 2030 targets for its own workforce (page 74-76):
- Zero serious accidents by 2030. The base year 2022 had 2 serious accidents and 2025 also had 2.
- At least 20 percent skilled female workers by 2030, from 7 percent in the 2021 base year and 7 percent in 2025.
- At least 40 percent women and no more than 60 percent men among managers by 2030, from 31 percent in the 2023 base year and 32 percent in 2025.
- No employee experiences abusive conduct, sexual harassment or discrimination by 2030; 4 percent reported it in the 2021 base year and 6 percent in 2025.
JM notes the female skilled worker target is challenging because of the recession and its effect on short-tenure staff, and that the 2025 harassment figure rose slightly against the base year. Employees and their representatives did not take part in setting the targets but are involved in follow-up, which runs quarterly through the HR system or annually through the employee survey (pages 75-76).
S1-5(was S1-6)Characteristics of the undertaking's employeesReported
Characteristics of the undertaking's employees
Reference: page 76.
JM had 1,916 employees at the end of 2025, down from 2,033 in 2024: 1,830 permanent, 10 temporary and 76 on a call-in basis (2025). By gender the total is 557 women and 1,359 men, with none reported as other. By country 1,466 are in Sweden, 178 in Finland and 272 in Norway (2025). The count is of employees, not full-time equivalents (page 76).
345 employees left in 2025 compared with 463 the previous year, giving employee turnover of 18 percent against 23 percent in 2024. JM also reports two unit-specific diversity measures: female tradespeople at 7 percent in both 2025 and 2024, and female managers at 33 percent in 2025 against 30 percent in 2024 (page 76). Data come from the HR system with no assumptions and were not externally validated.
S1-6(was S1-7)Characteristics of non-employee workersReported
Characteristics of non-employee workers
Reference: page 76.
JM reports 206 workers who are not its employees at the end of 2025, down from 230 in 2024. They are primarily white-collar consultants; showing hosts and unpaid interns are not included. All consultants are registered in JM's HR system, which is required for ID06 authorisation, access to premises and IT profiles. Hired skilled workers are engaged as subcontractors and are therefore not counted as non-employee workers, and no personnel were loaned from other construction companies in 2025. The figure is the number at the end of the reporting year and no assumptions were made; the metric was not externally reviewed (page 76).
S1-8(was S1-9)Diversity metricsReported
Diversity metrics
Reference: page 76.
At Group management level JM reports in 2025 four women (40 percent) and six men (60 percent), compared with three women (33 percent) and six men (67 percent) in 2024. Age distribution of employees in 2025: 179 under 30, 998 aged 30-50 and 739 over 50, against 205, 1,068 and 760 in 2024 (page 76).
JM adds unit-specific diversity measures to track its targets: female tradespeople at 7 percent in both years, and female managers at 33 percent in 2025 and 30 percent in 2024. Data come from the HR system with no assumptions and no external validation (page 76). GOV-1 gives a different executive management split (page 42).
S1-13(was S1-14)Health and safety metricsReported
Health and safety metrics
Reference: page 77.
All of JM's own employees (100 percent) are covered by a health and safety system. There were no work-related fatalities in 2025 or 2024. Reported workplace accidents among employees numbered 140 in 2025 against 157 in 2024, with frequencies the report gives as 14 and 12 percent, based on accidents per million hours worked. Lost workdays from work-related injuries fell from 913 in 2024 to 454 in 2025, which JM attributes mainly to the nature of the injuries needing shorter sick leave (page 77).
Equivalent metrics for employees in Finland and Norway could not be produced for lack of supporting systems, to be reviewed in 2026. JM applies the ESRS 1 phase-in for health and safety among non-employees and for the number of cases of work-related ill health (page 41). It notes that not all accidents are reported and that sick leave is hard to link directly to an accident (page 77).
S1-16(was S1-17)Incidents, complaints and severe human rights impactsReported
Incidents, complaints and severe human rights impacts
Reference: page 77.
JM reports 6 cases of discrimination, including harassment, in 2025 compared with 9 in 2024, and 2 complaints submitted through channels for its own workforce in the 2025 column. No fines, penalties or compensation were recorded, and no serious human rights incidents involving the Group's employees were reported in the period (page 77). JM describes this as a stable low level, slightly down on 2024, and applies zero tolerance.
Complaints on serious human rights impacts are reported through the whistleblower system and BIA and handled by an established process of classification, investigation and follow-up. JM notes limits: not every case is reported through the channels because some go directly to a manager or HR, severity may be misclassified, and the data have not been verified by an external party (page 77).
S2 – Workers in the Value Chain
S2-1Policies related to value chain workersReported
Policies related to value chain workers
Reference: page 79.
JM's Code of Conduct for Suppliers and Subcontractors sets requirements on human rights, labour law, the environment, anti-corruption, and health, safety and equality. It is based on the UN Guiding Principles, the OECD Guidelines, the ILO core conventions and the UN Global Compact, applies to all suppliers and is included in all agreements. It includes rules against insecure employment, human trafficking, forced labour and child labour and addresses JM's upstream value chain.
Compliance is ensured through risk analyses, surveys, in-depth inspections and site visits, with action plans and corrective measures required on deviations, and a supplier evaluation group responsible for risk identification and follow-up. The code is published on JM's website. JM states there have been no reported cases of non-compliance with its policy for workers in the value chain, and the Head of Sustainability is responsible for implementing the code (page 79).
S2-2(was S2-2 + S2-3)Engagement with workers in the value chain, existence of channels for workers in the value chain to raise concerns or needs and approaches to remedyReported
Processes for engaging with value chain workers about impacts
Reference: page 79.
JM takes value chain workers' perspective into account in decisions on material impacts. Discussions take place directly with subcontractor workers or via their representatives, and follow-up meetings are always held with a representative. The report lists channels: a reporting system for work environment risks and incidents available to suppliers on JM projects; follow-up meetings with framework agreement suppliers, usually one to two times a year; weekly coordination meetings and safety rounds at project sites; risk analysis and supplier review before agreements, with desk audits at least four times a year; on-site inspections including interviews of employees by third parties; and unannounced safety surveys four times a year at each workplace that include subcontractors' workforce. The work environment manager owns work environment channels and the sustainability manager owns supply chain topics (page 79).
Processes to remediate negative impacts and channels for value chain workers to raise concerns
Reference: page 79.
If deviations are found in inspections, action plans are set with the supplier and followed up through return visits, photo documentation and documentation review to confirm the measures worked (page 79).
JM offers several reporting channels, all established by JM though some systems are provided by third parties: follow-up meetings with supplier contract managers; direct contact with site management at any time; incident and risk observation systems in Sweden, Norway and Finland that suppliers and subcontractors can use; and an anonymous whistleblower function on JM's website open to suppliers and subcontractors. The Code of Conduct requires suppliers to protect whistleblowers and bars punishing good-faith reports. JM says site inspections and visits show that workers appreciate the structure and rate the channels as effective (page 79).
S2-3(was S2-4)Taking action on material impacts on value chain workersReported
Taking action on material impacts on value chain workers
Reference: page 80.
JM monitors compliance with its Code of Conduct for Suppliers and Subcontractors through sustainability forms in procurement, annual in-depth inspections, site visits and controls at construction sites. In 2025 it ran unannounced on-site inspections of four contractors at its sites and four desk audits, with four desk audits and four on-site inspections planned for 2026 (page 80).
Findings were addressed through action plans: training on fire protection and on JM's safety training, an escalation ladder of reprimand, dismissal from the workplace and contractual measures, and information efforts on personal protective equipment. When unequal supplier wages were suspected, JM verified wage levels and found them equal. JM analyses about 20 suppliers a year in depth, and requires an action plan within six weeks if on-site inspections find deficiencies. It reports that no serious negative impact was found at suppliers or on its sites in 2025, so no remediation was needed, and that the work is carried out without special financial resources (page 80).
S2-4(was S2-5)Targets related to managing material negative impacts, advancing positive impacts, and managing material risks and opportunitiesReported
Targets related to managing material negative impacts, advancing positive impacts, and managing material risks and opportunities
Reference: page 80.
JM's target is that 100 percent of its suppliers, covering framework agreements and project purchases, have signed JM's Code of Conduct for Suppliers and Subcontractors or have equivalent content in their own code of conduct, by 2027 (page 78). The report states that by 2025 100 percent of framework agreement and project purchasing suppliers had signed or shown equivalent content, so JM "thus meets the target" (page 80).
The target is annual, so no base year is set, and it was developed with the sustainability and procurement departments and approved by the Board. JM states it has not held its own continuous discussions with value chain workers on target formulation, does not analyse trends in performance against the target, and that the metric was not reviewed by an external party (page 80). Fulfilment is measured from the purchasing system for all suppliers regardless of location.
S4 – Consumers and End-users
S4-1Policies related to consumers and end-usersReported
Policies related to consumers and end-users
Reference: page 82.
JM states that it has no separate policy for consumers and end-users, because access to quality information has so far been handled within existing governing documents, and that "a policy for consumer and end-user issues is expected to be in place by 2027" (page 82). The SBM-3 table repeats that JM has no policy for consumers and end-users (page 81). The disclosure is covered in JM's content index with page 82.
S4-2(was S4-2 + S4-3)Engagement with consumers and end-users, existence of channels for consumers and end-users to raise concerns or needs and approaches to remedyReported
Processes for engaging with consumers and end-users about impacts
Reference: page 82.
JM continuously collects insights from consumers and end-users to keep information clear and relevant through the customer journey, with contacts before, during and after completion. A table of contact paths lists, before purchase, web pages, expressions of interest, customer surveys and sales starts; during, the showroom, interior choices, previews and inspection; and after, occupancy support, error correction, CSI surveys at occupancy and warranty, warranty inspections, and aftermarket service (page 82).
Marketing communications, sales, business development and aftersales share responsibility, and the business unit managers and head of business development, all members of executive management, hold highest operational responsibility. Effect is assessed through increased customer satisfaction and fewer recurring questions or complaints, and feedback on accessibility and understandability from groups with special needs is analysed (page 82).
Processes to remediate negative impacts and channels for consumers and end-users to raise concerns
Reference: page 82.
JM states it "has not identified any negative effects related to consumers and end users" but offers channels for raising problems, needs or questions: customer service, case management systems, housing stores and websites. It evaluates their effectiveness through customer satisfaction survey results, digital and physical touchpoints and customer service feedback.
Channels also exist through business relationships. Real estate agents are often the first contact, and JM monitors them through discussions and customer feedback. Product suppliers provide technical support and product information, assessed through complaint cases, inspection observations and satisfaction surveys. The third-party supplier that runs JM's customer satisfaction surveys is a further route, checked through response rates and free-text answers (page 82).
S4-3(was S4-4)Taking action on material impacts on consumers and end-users, and approaches to managing material risks and pursuing material opportunities related to consumers and end-users, and effectiveness of those actionsReported
Taking action on material impacts on consumers and end-users, and approaches to managing material risks and pursuing material opportunities related to consumers and end-users, and effectiveness of those actions
Reference: page 83.
JM treats access to clear, relevant and accurate quality information as essential to maintaining its positive impact. Actions include digital customer portals where buyers follow the construction process and access information on construction technology, material choices, management and quality standards; on moving in, operating instructions, technical documentation, warranty terms and informational meetings; and reporting of environmental performance, climate impact, energy class and Nordic Swan Ecolabel information in sales materials and portals (page 83).
The work is a continuous process measured annually. JM follows up effects through customer satisfaction surveys, analysis of support cases, training participation, inspection data and digital statistics, and reports results to responsible functions as the basis for improvement decisions. It covers all markets where JM operates (page 83).
S4-4(was S4-5)Targets related to managing material negative impacts, advancing positive impacts, and managing material risks and opportunitiesReported
Targets related to managing material negative impacts, advancing positive impacts, and managing material risks and opportunities
Reference: page 83.
JM states it has no separate target for the positive impact on consumers and end-users through quality information, because the area is managed within existing governing documents. Effectiveness is measured through the customer satisfaction index (CSI), where JM aims for a high outcome each year and to be a leading housing developer (page 83).
In the 2025 surveys run by Prognoscentret, JM ranked first in Sweden with a CSI of 80 and third in Norway with 83, both in the range "Good" to "Very good". In Finland, where no external survey exists, JM's own survey gave 85. The Swedish and Norwegian results are reviewed by Prognoscentret; the Finnish results are not reviewed by a third party (page 83).
G1 – Business Conduct
G1-1Business conduct policies and corporate cultureReported
Business conduct policies and corporate culture
Reference: page 86.
JM has four policy documents: Anti-bribery Guidelines (benefits, representation, study trips, conferences, conflicts of interest), Ethical Guidelines, the Code of Conduct, and the Code of Conduct for Suppliers and Subcontractors with minimum anti-corruption requirements. Supervision runs through the Ethical Council and whistleblower function internally and through in-depth reviews and site visits at suppliers. The policies aim to comply with the Swedish Construction Federation's Code of Conduct, the Swedish Anti-Corruption Institute's Code and applicable legislation (page 86).
JM does not have a policy for regular business ethics training but has recurring training modules, and its whistleblower function is open to internal and external stakeholders without a separate policy, referring to current legislation. Within the Group there is zero tolerance for corruption and bribery. The functions at greatest risk include project purchasers, site managers, pre-construction managers, acquisition managers and project and business developers (page 86).
G1-2(was G1-2 + G1-3)Actions related to business conductPartly reported
Prevention and detection of corruption and bribery
Reference: page 86.
JM works proactively and reactively. Proactive work is training every three years for functions with risk exposure, and all employees are responsible for reading JM's guidelines. New suppliers are reviewed and risk-assessed, repeated every three years, with in-depth reviews of suppliers and subcontractors. Reactive reporting runs through a whistleblower function administered by an independent company and guidance from the Ethical Council (page 86).
Reports go to an impartial investigation team of the Chief Legal Counsel, Director of Human Resources and head of internal audit, with conflicted members excluded and the CEO taking over if a conflict persists. The team decides whether to investigate, may engage external advisors and reports to the CEO. The Board is informed quarterly of the number of cases. The Code of Conduct and Business Ethics course was last held in the fourth quarter of 2025: 602 of 716 employees in risk-exposed functions had completed it, and all executive management members must complete it (page 86).
G1-3(part of MDR-T/GDR-T disclosures)Targets related to business conductReported
Targets related to business conduct
Back-filled from the business conduct chapter, where targets are addressed through MDR-T rather than a numbered disclosure requirement. G1-3 became a standalone DR only in the 2025/2026 ESRS.
Reference: page 86.
JM states it has no business conduct target. "JM does not have a Group-level target for following up on the effectiveness of Group policies and measures against corruption and bribery" (page 86). Consistent with the MDR-T limb on tracking effectiveness without a target, JM describes how it follows up: through oversight of whether matters have been reported to the Ethical Council, the impartial investigation team, the whistleblower function or relevant authorities, with the Board informed quarterly of the number of reported cases (page 86). The content index lists MDR-T under G1-1 with page 86 (page 53). The only quantified progress metric is training completion, with 602 of 716 risk-exposed employees having completed the course (page 86).
G1-4Incidents of corruption or briberyReported
Incidents of corruption or bribery
Reference: page 86.
JM reports that no convictions related to corruption or bribery were reported during 2025 and no fines were paid. The metric is based on matters reported to the Ethical Council, the impartial investigation team, the whistleblower function and relevant authorities. JM states no external party has reviewed the data, and names as a limitation any judgments or decisions from authorities issued outside the jurisdictions in which JM operates. The unit is the currency used in the financial statements (page 86). The EU Taxonomy minimum safeguards section also records that no convictions on corruption, tax, environmental crimes, human rights violations or competition were reported in 2025 (page 55).